Extension of the administrative location of the Görlitz District Office - Lot 22-S Painting work Salomonstraße 10-14
WILL:
- approx. 9.500 m² Schutzabdeckung
- approx. 3,500 m² full-surface special protective cover
Interior walls plaster
- approx. 5,400 m² of painting work on plaster surfaces + pre-treatment of the substrate
- approx. 4,085 m reveals at openings and niches with different depths
Sanierputz Keller
- approx. 1,660 m² of painting work on renovation plaster surfaces + pre-treatment of the substrate
-ca. 600 m reveals at openings and niches with different depths
Drywall
- approx. 2,300 m² of pre-primed glass fleece + pre-treatment substrate
-ca. 440 m reveals at openings and niches up to 15 cm deep
- approx. 1,500 m wallpaper, corner or end profile
Drywall ceilings
- approx. 550 m² Pre-primed glass fleece + pre-treatment substrate, tinted paint
- approx. 180 m reveals at openings and niches up to 15 cm deep
- approx. 600 m wallpaper, corner or end profile
Stahlbetondecken
- approx. 2,050 m² of substrate clean formwork oil residues
Interior doors - primed steel component / metal paint or metal effect paint
- approx. 390 m² Prepare frame + door leaf, fill damaged areas, paint
Treppenhauswände
- approx. 700 m² primer, filler with fleece embedding, second full-surface filling,
- approx. 380 m² of pre-treatment of the painting system with substrate
- approx. 240 m reveals at openings and niches Reveal depth: 30 cm
- approx. 160 m historical corner training
- approx. 200 m Abschlussprofil
Treppenunterlauf
- Completely remove approx. 200 m² of glue paints or wallpaper or woodchip, deep primer silicate, full-surface filler with fleece silicate
- approx. 700 m wallpaper, corner or end profile
-ca. 40 m² painting
Interior railing wood
- approx. 200 m² coating wooden railing
- approx. 100 m coating handrail
Granitstufen
- approx. 160 pcs clean natural stone steps
- approx. 100 m remove + renew desolate joints