Preparation of the assembly, installation of the own logistics for the construction site and storage area, including the connection to the on-site supply and disposal pipelines, the earthworks in coordination with the rest of the construction logistics, reinforced concrete works, concrete finishing elements and intrigued TGA components such as basic lines, conduit pipes, Cables for concrete core temperature control
— remove the vegetation layer, dispose of — 6 400.00 m
— Load the top floor — 1 920.00 m³,
— Solve ground excavation pit load transport — 11 660,00 m³,
— Drill Bore Bore Dia. 620 mm D 7-9 m Floor HB A2, A3 — 60.00 m,
— base plate 40-75 cm — 1 800.00 m
— reinforced concrete walls — 4 200,00 m
— reinforced concrete slab with BKT — 8 200.00 m
— masonry KS — 400,00 m
— reinforcing bars — 690,00 t,
— conduits — 450,00 m,
— Concrete core capacity utilization system — 2,200.00 m
Preparation of the assembly, installation of the own logistics for the construction site and storage area, including the connection to the on-site supply and disposal pipelines, the earthworks in coordination with the rest of the construction logistics, reinforced concrete works, concrete finishing elements and intrigued TGA components such as basic lines, conduit pipes, Cables for concrete core temperature control
— remove the vegetation layer, dispose of — 6 400.00 m
— Load the top floor — 1 920.00 m³,
— Solve ground excavation pit load transport — 11 660,00 m³,
— Drill Bore Bore Dia. 620 mm D 7-9 m Floor HB A2, A3 — 60.00 m,
— base plate 40-75 cm — 1 800.00 m
— reinforced concrete walls — 4 200,00 m
— reinforced concrete slab with BKT — 8 200.00 m
— masonry KS — 400,00 m
— reinforcing bars — 690,00 t,
— conduits — 450,00 m,
— Concrete core capacity utilization system — 2 200.00 m