The subject of the contract includes the execution of construction and assembly works aimed at connecting buildings located at 240 Nowopogońska Street to the heating network; Betonowa 2; Betonowa 4; Betonowa 8; Concrete 10; Betonowa 12; Betonowa 14; Betonowa 16 in Czeladź - as part of the project entitled: "Elimination of low emissions in selected cities of the Silesian-Dąbrowa agglomeration", constituting part of the "Low Emission Elimination Program in the Silesian-Dąbrowa Conurbation" (hereinafter also the Facility) in the scope of: construction of heating networks and connections, heat nodes, connection modules without central heating meters, and central heating meters, including through the delivery of equipment, in accordance with the design documentation and handover The object to the Ordering Party for use.
The subject of the contract includes the execution of construction and assembly works aimed at connecting buildings located at 240 Nowopogońska Street to the heating network; Betonowa 2; Betonowa 4; Betonowa 8; Concrete 10; Betonowa 12; Betonowa 14; Betonowa 16 in Czeladź - as part of the project entitled: "Elimination of low emissions in selected cities of the Silesian-Dąbrowa agglomeration", constituting part of the "Low Emission Elimination Program in the Silesian-Dąbrowa Conurbation" (hereinafter also the Facility) in the scope of: construction of heating networks and connections, heat nodes, connection modules without central heating meters, and central heating meters, including through the delivery of equipment, in accordance with the design documentation and handover The object to the Ordering Party for use.
The procedure forms part of contracts concerning the performance of construction and assembly works for the implementation of connections of new facilities to the heating network under the project “Liquidation of low emissions in selected cities of the Silesia Drowbrowska agglomeration”, part of the 'Decommissioning Programme low emission in the Silesian and Dust Browska conurbation”. The total value of these proceedings exceeds EUR 5,382 000,00.
A detailed description of the Subject of the Order is set out in the Draft Agreement (Annex 3 to the SWZ), in particular by: The scope of the Subject of the Agreement (Annex No 1 to the Project Agreement) and the Technical Documentation (Annex No 2 to the Project Agreement).
Required terms:
- heat application: until 25.09.2023 for all buildings
- complete completion of works and final acceptance: by 31.10.2023.
- deadline for handing over rooms for the development of heat substations and connection modules: by 01.09.2023.