Construction project: Renovation of the primary and secondary school Tann, trade: drywall construction work
Trockenbauarbeiten BA II:
1400 m² GK acoustic ceilings
750 m² injection dowel with high-performance mortar
20 m² GK ceilings, impregnated
145 m² GK ceilings, smooth
1200 m unperforated edge frieze
300 m² acoustic element ceilings, self-supporting, 400x2400 mm
160 m GK frieze training for self-supporting acoustic element ceilings
1200 running meters wall connection, sliding version
1400 m² insulation material, 20 mm thick
10 m² fire protection cladding for plastic air ducts L 90
80 hrs Inspection flaps with insert
220 running metre substructure for luminaire mounting
40 lfm Elektrokabelkanal I 90