The housing industry Frankfurt (Oder) GmbH is comprehensively renovating the residential complex Juri-Gagarin-Ring 1 - 41 in the years 2022 to 2024. The area Juri-Gagarin-Ring 1 - 41 was built in 1970 in industrial construction (IW 66/P2-5 storey). All seven residential buildings have a basement, 5 upper floors and a Drempelgeschoss. In each staircase there are 10 apartments (two-horse). A total of 359 apartments are to be renovated over the 3rd construction phases.
The services of the 3rd phase of construction include the buildings Yuri Gagarin Ring 1 - 4, 5 - 9 and 10 - 14 with a total of 129 apartments after renovation.
The renovation work will be advertised in 23 lots:
Lot 301 Baustraße
Los 302 BE
Lot 303 Crane operated dismantling
Lot 304 Demolition and gutting
Lot 305 Scaffolding
Lot 306 Shell construction and plastering work
Lot 307 Civil engineering work and outdoor facilities
Lot 308 EIFS and façade
Lot 309 Roofers
Lot 310 plastic windows
Lot 311 aluminum elements
Lot 312 Balconies/entrance stems
Lot 313 Basement ceiling and dremple insulation
Lot 314 Interior, functional and cellar doors
Lot 315 Drywall works
Lot 316 screed work
Lot 317 Painting works
Lot 318 Flooring work
Lot 319 tiling work
Lot 320 final cleaning
Lot 321 Balcony renovation (3rd BA only)
Los 401 HLS
Lot 402 Electrical Work
Lot 403 Elevator systems
The subject of this award is only Lot 403 - Lift systems
During the entire construction period, the apartments are mostly occupied!
The staircases J.-Gagarin-Ring 1 - 4 and 5 are pulled free. This is where floor plan changes are made.
Elevator systemsJG01-04
- 2 630 kg elevator
- 2 Oberlichterband
JG05
- 1 630 kg elevator
- 1 Oberlichtband
JG06-09
- 4 P2 300 kg elevators incl. steel-glass shaft frame and elevator pit
- 4 Oberlichtbänder
JG10-14
- 5 p2-300 kg elevators including steel-glass shaft scaffolding and lift pit
- 5 skylight bands