Sewer construction, district heating pipe construction, gas and water pipeline construction, civil engineering work for e-supply and telecommunications, road construction work
South AreaLot 1 includes the trades district heating, sewer construction, gas HD and ND pipes, water pipe construction, e-supply and communications technology as well as extensive road construction.
In detail:
- District heating KMR DN 300/450 approx. 2500 linear metres, FW overhead line DN 300 approx. 130 metres
- Channel construction RW DN 600 -300 approx. 950m, RW DN 1000-600 approx. 580m, SW channel DN 250 approx. 1100m,
Kanalschachtbauwerke 13 x Kombischacht, 12 x Standardschacht.
- Gas HD line DN 400 approx. 1950m, Dn 200 approx. 170m
- Gas ND DN 200 ca. 1600m
- Wasser DN 400 ca. 200m, DN 200 ca. 570m, DN 150 ca.330m
- E-supply 10kV approx.360m, 1kV approx. 2000m (civil engineering services only)
- Telecommunications empty pipe laying 3 x50 in triangular composite approx. 2650m
The route in lot 1 is divided into five sections:
- Connection Simonsstraße - Vogelsauer Treppe
- Vogelsaue - Nützenberger Straße
- Nützenberger Straße - Kyffhäuser Straße
- Nützenberger Straße - Otto Hausmann Ring
- Otto Hausmann Ring - Am Eskesberg
North AreaLot 2 includes the district heating and communications engineering trades as well as road construction to a small extent.
In detail:
- District heating KMR DN 300/450 approx. 2550 linear metres, FW
- Telecommunications empty pipe laying 3 x50 in triangular composite approx. 2550m
The route in lot 2 is divided into six sections:
- Nordbahntrasse
- Landfill
- In der Beek
- Forest path
- Horse paddock - Pahlkestraße
- Bayer premises