Preparation of a preliminary draft into a final design and assistance during the execution of the adoption.
The content of the study assignment consists of:
- road, rail and sewerage works in the Poperingestraat (full street), the Radijsstraat (complete street), the Dikkelindestraat (from the Grensstraat intersection to the Kolegemstraat intersection), part of the Kolegemstraat (from house no. 85 to 139), and the realization of an RWA axis in the Grensstraat or in the Zandstraat.
Please note: The study and design of the rail infrastructure is largely carried out by De Lijn itself. The integration of that design into the road design is part of the study assignment.
- concept study sewerage
(hydraulic modelling and screening)
- drawing up feasibility study into the realization of the RWA vision either via the Grensstraat to the Hakkenijstraat or via the Zandstraat to the Hakkenijstraat dewatering study.