Meters | Tenderlake

Meters

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
17 September 2019
Closing Date:
15 October 2019
Location(s):
DEA2D Städteregion Aachen (DE Germany/DEUTSCHLAND)
Description:
Framework agreements for assembly and disassembly of meters and controllers

Assembly, disassembly and replacement of electricity, gas and water meters, gas pressure regulators as well as internal power supply lines in the supply area of the Regionetz GmbH and the related services.


Assembly, disassembly and replacement of meters in the electricity sector

Installation, dismantling and replacement of approx. 88 000 electricity meters as well as verification of approx. 64 000 house connections, setting of approx. 18 000 first-time meters and all related services in the entire network area of the Regionetz GmbH.


Assembly, disassembly and replacement of meters in the gas and water sectors

Assembly, disassembly and replacement of meters

- in the gas sector: of approx. 32 000 gas meters and checking of approx. 32 000 domestic connections

- in the water division: of approx. 40 000 water meters as well as inspection of approx. 40 000 house connections and setting of approx. 240 first-time meters and all related services in the entire network area of the Regionetz GmbH.


Carrying out first-time counterings and unlocking counters in the gas sector

Implementation of approx. 8,000 first-digit metering and approx. 800 unlocking of gas meters and all related services in the entire network area of the Regionetz GmbH.


Exchange of gas pressure regulators and performance of functional tests and separate house connection checks in the gas sector in area A

Replacement of approx. 5,800 gas pressure regulators, approx. 7,700 functional tests on HD, MD controllers and execution of approx. 12,000 separate house connection inspections and all associated services in the entire network area of the Regionetz GmbH.


Exchange of gas pressure regulators and performance of functional tests and separate house connection checks in the area of gas in area B

Exchange of approx. 5 500 gas pressure regulators, execution of approx. 3 200 functional tests on HD and MD controllers and execution of approx. 12 000 separate house connection inspections and all associated services in the entire network area of the Regionetz GmbH.

Download full details as .pdf
The Buyer:
Regionetz GmbH, vertreten durch die E.V.A. Energieversorgungs- und Verkehrsgesellschaft mbH Aachen
CPV Code(s):
38421100 - Water meters
38550000 - Meters
38551000 - Energy meters
45333200 - Gas meter installation work