Plaster and stucco work for the conversion of a listed monastic church ensemble, which consists of three spatially and temporally interlinked individual construction measures (BT 1 - new building foyer with UG / BT 2 - restoration and reconstruction of the south wing Klosterkirche / BT 3 - restoration of the monastery church).
Cleaning work inside BT 2 (Südflügel Klosterkirche):
Ceiling filling approx. 70 m
Interior plaster on window reveals approx. 100 m
Interior plaster wall surfaces approx. 550 m