Distribution system of approx. 6,500 metres with pump line for waste water and water supply. In addition, conduits are to be laid for fibre, as well as high/low voltage cables in the same ditch. This contract is for a submarine pipeline, approx. 1400 metres.
Distribution system of approx. 6,500 metres with pump line for waste water and water supply. In addition, conduits are to be laid for fibre, as well as high/low voltage cables in the same ditch. This contract is for a submarine pipeline, approx. 1400 metres.