Refurbishment of the electrical cable system of the approx. 535 m long quay of the naval barracks in Neustadt / Holstein.
Removal and replacement of street lighting. Unlock, dismantle and dispose of existing electrical installations (low to high voltage technology). Installation of high and low power supply, as well as cables for information technology in supply channels of berths and empty pipes.