The purpose of this contract is to set up a storage and pre-assembly hub in Cherbourg for the constituent elements of the wind turbines for the future Fécamp field.
The purpose of this contract is to set up a storage and pre-assembly hub in Cherbourg for the constituent elements of the wind turbines for the future Fécamp field, which covers:
- the execution study of the works, execution study based on an APS and a G2 AVP and the associated phasing taking into account the reduced timeframe of the works;
- the execution of works and structures; earthworks, stonework, coating, civil engineering, soil reinforcement solution (deep, etc.), hard and flexible networks (MV networks);
- carrying out the tests. All this close to the quayside and by reusing as much as possible of the existing structures.