Metroselskabet I/S and Hovedstadens Letbane I/S (hereinafter named the Client) jointly procures a framework agreements with 4 consultants. The framework agreement includes Assessor services for several projects, among these the new M5 alignment and the extension of M4 Nordhavn. Please refer to section II.2.4) and the tender documentation for a detailed description of the framework agreement and the call off methods for the Framework agreement.
The Client are procuring a joint Framework Agreement including Assessor services. The Client expects the Framework Agreement to be used in multiple projects. Currently, the Client expects the first award of contract to a mini-tender for assessor services related to the M5 Østhavn-project. Other projects relevant to the Framework Agreement are the extension of M4 Nordhavn and various smaller contracts related to the construction of the Light Rail.
The Client is not obligated to use the Framework Agreement. The framework agreement covers the following disciplines:
a) Infrastructure,
- Underground structures and tunnels
- Above ground structures and bridges
- Geotechnics including groundwater
- Experience with concrete, steel and timber structures (latter is optional)
- Trackworks, slab and ballasted tracks
b)Energy
-Traction Power and Power Supply
-Third Rail
-Overhead Contact Line
c) Control-command and signalling (trackside and onboard)
- CBTC
- Interlocking
- Telecommunication Systems
d) Rolling stock
- Metro vehicles for underground operation
- Light Rail Vehicles
- Service Vehicles
e)Traffic operation and management
- Operational safety rules
f) Maintenance
- Technical Safety rules
g) System safe integration
h) Fire Safety- Buildings fire safety systems, including fire alarm and fire fighting
- Tunnel ventilation