1. The subject of the contract is the provision of services in the field of delivery of wozożek - divożników -
Service G - consisting of transporting Shipments (including Shipments containing Postal Shipments), under which the Contractor is obliged to:
a) accepting Shipments for transport,
b) loading the Shipments onto the vehicle and their arrangement in the vehicle,
c) unloading Shipments from a vehicle,
In the places specified in the draft contract.
The courses will be implemented within the area of POL RD, i.e. in the Wielkopolskie and Lubuskie Voivodships.
The services that are the subject of the contract will be performed in accordance with the specifications contained in the Service G Schedule, constituting Annex 8 to the draft contract.
Provision of services in the field of delivery of short-wanded-divorce courses - Service G - Course number PC 128The subject of the contract is the provision of services in the field of delivery of wicker and diversion courses - Service G - consisting in the transport of Shipments (including Shipments containing Postal Shipments), under which the Contractor is obliged to:
a) accepting Shipments for transport,
b) loading the Shipments onto the vehicle and their arrangement in the vehicle,
c) unloading Shipments from a vehicle,
In the places specified in the draft contract.
Course number PC 128.
The maximum amounts of services that can be commissioned to the Contractor by the Employer as part of the contract:
- the maximum number of kilometers with the right option (100%) - 46 482
- the number of kilometers covered by the so-called basic order (70%) - 32 537
- number of kilometers covered by the option right (30%) - 13,945
The maximum number of courses (100%) broken down into so-called the basic order (70%) and the option right (30%) are included in the ToR.
In the event that during the term of the contract the Contractor's remuneration does not reach
The maximum remuneration, the Parties may jointly extend the duration of the contract for a maximum of 3 months, but not longer than until the amount
The remuneration for the services rendered by the Contractor will reach the maximum remuneration. The extension of the period of validity according to the previous sentence requires a written form under
The rigor of nullity.
Provision of services in the field of delivery of short-wanded-divorce courses - Service G - Course number PC 79The subject of the contract is the provision of services in the field of delivery of wicker and diversion courses - Service G - consisting in the transport of Shipments (including Shipments containing Postal Shipments), under which the Contractor is obliged to:
a) accepting Shipments for transport,
b) loading the Shipments onto the vehicle and their arrangement in the vehicle,
c) unloading Shipments from a vehicle,
In the places specified in the draft contract.
Course number PC 79.
The maximum amounts of services that can be commissioned to the Contractor by the Employer as part of the contract:
- the maximum number of kilometers with the right option (100%) - 61 976
- the number of kilometers covered by the so-called basic order (70%) - 43 383
- number of kilometers covered by the option right (30%) - 18,593
The maximum number of courses (100%) broken down into so-called the basic order (70%) and the option right (30%) are included in the ToR.
In the event that during the term of the contract the Contractor's remuneration does not reach the maximum remuneration, the Parties may agree to extend the period once
The contract is valid for a maximum of 3 months, but not longer than until the remuneration for the services rendered by the Contractor reaches the maximum remuneration.
The extension of the period of validity in accordance with the previous sentence of the contract requires a written form, otherwise being null and void.
Provision of services in the field of delivery of short-wandering-diversion courses - Service G - Course number PC 25The subject of the contract is the provision of services in the field of delivery of wicker and diversion courses - Service G - consisting in the transport of Shipments (including Shipments containing Postal Shipments), under which the Contractor is obliged to:
a) accepting Shipments for transport,
b) loading the Shipments onto the vehicle and their arrangement in the vehicle,
c) unloading Shipments from a vehicle,
In the places specified in the draft contract.
Course number PC 25.
The maximum amounts of services that can be commissioned to the Contractor by the Employer as part of the contract:
- the maximum number of kilometers with the right option (100%) - 8,996
- the number of kilometers covered by the so-called basic order (70%) - 6 297
- number of kilometers covered by the option right (30%) - 2 699
The maximum number of courses (100%) broken down into so-called the basic order (70%) and the option right (30%) are included in the ToR.
In the event that during the term of the contract the Contractor's remuneration does not reach the maximum remuneration, the Parties may agree to extend the period once
The contract is valid for a maximum of 3 months, but not longer than until the remuneration for the services rendered by the Contractor reaches the maximum remuneration.
The extension of the period of validity in accordance with the previous sentence of the contract requires a written form, otherwise being null and void.
Provision of services in the field of delivery of short-wandering-diversion courses - Service G - Course number PC 133The subject of the contract is the provision of services in the field of delivery of wicker and diversion courses - Service G - consisting in the transport of Shipments (including Shipments containing Postal Shipments), under which the Contractor is obliged to:
a) accepting Shipments for transport,
b) loading the Shipments onto the vehicle and their arrangement in the vehicle,
c) unloading Shipments from a vehicle,
In the places specified in the draft contract.
Course number PC 133.
The maximum amounts of services that can be commissioned to the Contractor by the Employer as part of the contract:
- the maximum number of kilometers with the right option (100%) - 24 384
- the number of kilometers covered by the so-called basic order (70%) - 17 069
- number of kilometers covered by the option right (30%) - 7 315
The maximum number of courses (100%) broken down into so-called the basic order (70%) and the option right (30%) are included in the ToR.
In the event that during the term of the contract the Contractor's remuneration does not reach the maximum remuneration, the Parties may agree to extend the period once
The contract is valid for a maximum of 3 months, but not longer than until the remuneration for the services rendered by the Contractor reaches the maximum remuneration.
The extension of the period of validity in accordance with the previous sentence of the contract requires a written form, otherwise being null and void.
Provision of services in the field of delivery of short-wanded-divorce courses - Service G - Course number PC 130The subject of the contract is the provision of services in the field of delivery of wicker and diversion courses - Service G - consisting in the transport of Shipments (including Shipments containing Postal Shipments), under which the Contractor is obliged to:
a) accepting Shipments for transport,
b) loading the Shipments onto the vehicle and their arrangement in the vehicle,
c) unloading Shipments from a vehicle,
In the places specified in the draft contract.
Course number PC 130.
The maximum amounts of services that can be commissioned to the Contractor by the Employer as part of the contract:
- the maximum number of kilometers with the right option (100%) - 16 683
- the number of kilometers covered by the so-called basic order (70%) - 11 678
- number of kilometers covered by the option right (30%) - 5 005
The maximum number of courses (100%) broken down into so-called the basic order (70%) and the option right (30%) are included in the ToR.
In the event that during the term of the contract the Contractor's remuneration does not reach the maximum remuneration, the Parties may agree to extend the period once
The contract is valid for a maximum of 3 months, but not longer than until the remuneration for the services rendered by the Contractor reaches the maximum remuneration.
The extension of the period of validity in accordance with the previous sentence of the contract requires a written form, otherwise being null and void.
Provision of services in the field of delivery of short-wandering-diversion courses - Service G - Course number ZG 75.1The subject of the contract is the provision of services in the field of delivery of wicker and diversion courses - Service G - consisting in the transport of Shipments (including Shipments containing Postal Shipments), under which the Contractor is obliged to:
a) accepting Shipments for transport,
b) loading the Shipments onto the vehicle and their arrangement in the vehicle,
c) unloading Shipments from a vehicle,
In the places specified in the draft contract.
Course number PC ZG 75.1.
The maximum amounts of services that can be commissioned to the Contractor by the Employer as part of the contract:
- the maximum number of kilometers with the right option (100%) - 35 052
- the number of kilometers covered by the so-called basic order (70%) - 24,536
- number of kilometers covered by the option right (30%) - 10 516
The maximum number of courses (100%) broken down into so-called the basic order (70%) and the option right (30%) are included in the ToR.
In the event that during the term of the contract the Contractor's remuneration does not reach the maximum remuneration, the Parties may agree to extend the period once
The contract is valid for a maximum of 3 months, but not longer than until the remuneration for the services rendered by the Contractor reaches the maximum remuneration.
The extension of the period of validity in accordance with the previous sentence of the contract requires a written form, otherwise being null and void.
Provision of services in the field of delivery of wozzo - diversion courses - Service G - Course number ZG 33The subject of the contract is the provision of services in the field of delivery of wicker and diversion courses - Service G - consisting in the transport of Shipments (including Shipments containing Postal Shipments), under which the Contractor is obliged to:
a) accepting Shipments for transport,
b) loading the Shipments onto the vehicle and their arrangement in the vehicle,
c) unloading Shipments from a vehicle,
In the places specified in the draft contract.
Course number PC ZG 33
The maximum amounts of services that can be commissioned to the Contractor by the Employer as part of the contract:
- the maximum number of kilometers with the right option (100%) - 59 690
- the number of kilometers covered by the so-called basic order (70%) - 41 783
- number of kilometers covered by the option right (30%) - 17,907
The maximum number of courses (100%) broken down into so-called the basic order (70%) and the option right (30%) are included in the ToR.
In the event that during the term of the contract the Contractor's remuneration does not reach the maximum remuneration, the Parties may agree to extend the period once
The contract is valid for a maximum of 3 months, but not longer than until the remuneration for the services rendered by the Contractor reaches the maximum remuneration.
The extension of the period of validity in accordance with the previous sentence of the contract requires a written form, otherwise being null and void.
Provision of services in the field of delivery of wozzo - diversion courses - Service G - Course number PC 147, PC 147 ptThe subject of the contract is the provision of services in the field of delivery of wicker and diversion courses - Service G - consisting in the transport of Shipments (including Shipments containing Postal Shipments), under which the Contractor is obliged to:
a) accepting Shipments for transport,
b) loading the Shipments onto the vehicle and their arrangement in the vehicle,
c) unloading Shipments from a vehicle,
In the places specified in the draft contract.
Course number PC 147, PC 147 titled
The maximum amounts of services that can be commissioned to the Contractor by the Employer as part of the contract:
- the maximum number of kilometers with the right option (100%) - 31 190
- the number of kilometers covered by the so-called basic order (70%) - 21 833
- number of kilometers covered by the option right (30%) - 9,357
The maximum number of courses (100%) broken down into so-called the basic order (70%) and the option right (30%) are included in the ToR.
In the event that during the term of the contract the Contractor's remuneration does not reach the maximum remuneration, the Parties may agree to extend the period once
The contract is valid for a maximum of 3 months, but not longer than until the remuneration for the services rendered by the Contractor reaches the maximum remuneration.
The extension of the period of validity in accordance with the previous sentence of the contract requires a written form, otherwise being null and void.
Provision of services in the field of delivery of wozzo - diversion courses - Service G - Course number PC 152, PC 152The subject of the contract is the provision of services in the field of delivery of wicker and diversion courses - Service G - consisting in the transport of Shipments (including Shipments containing Postal Shipments), under which the Contractor is obliged to:
a) accepting Shipments for transport,
b) loading the Shipments onto the vehicle and their arrangement in the vehicle,
c) unloading Shipments from a vehicle,
In the places specified in the draft contract.
Course number PC 152, PC 152
The maximum amounts of services that can be commissioned to the Contractor by the Employer as part of the contract:
- the maximum number of kilometers with the right option (100%) - 17 312
- the number of kilometers covered by the so-called basic order (70%) - 12 118
- number of kilometers covered by the option right (30%) - 5,194
The maximum number of courses (100%) broken down into so-called the basic order (70%) and the option right (30%) are included in the ToR.
In the event that during the term of the contract the Contractor's remuneration does not reach the maximum remuneration, the Parties may agree to extend the period once
The contract is valid for a maximum of 3 months, but not longer than until the remuneration for the services rendered by the Contractor reaches the maximum remuneration.
The extension of the period of validity in accordance with the previous sentence of the contract requires a written form, otherwise being null and void.