River regulation and flood control works | Tenderlake

River regulation and flood control works

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
09 January 2024
Closing Date:
12 February 2024
Location(s):
FRY4 La Réunion (FR FRANCE)
Description:
Operation to remove submersible rafts in multiple locations within the municipality of Saint-Paul.
Operation to reabsorb submersible rafts on the territory of the municipality of Saint-Paul

The contract will consist of 4 geographical lots:Lot 1 - removal of raft 16 - Précipice ravine - Chemin Combavas (Bois-De Nèfles)Lot 2 - removal of raft 18 - Ravine la Fontaine - chemin Combavas (Bois-De Nèfles)Lot 3 - removal of raft 25 - Baptiste ravine - Summer road no3 (Guillaume)Lot 4 - removal of raft 47 - Jardin ravine - Zéphir road (le Hangar district in Bois-De Nèfles) and Removal of Raft 21 - Jardin ravine - Bassin road (le Hangar district in Bois-De Nèfles). The same candidate may not be awarded more than two lots. The candidate will therefore have to indicate in the deed of commitment the order of preference of the lots tendered

Lot 1 - removal of the slab 16 - Précipice ravine - chemin Combavas (Bois-De Nèfles)

Removal of slab 16 - Précipice ravine - chemin Combavas (Bois-De Nèfles)

Lot 2 - removal of raft 18 - Ravine la Fontaine - chemin Combavas (Bois-De Nèfles)

removal of raft 18 - Ravine la Fontaine - chemin Combavas (Bois-De Nèfles)

lot 3 - suppression du radier 25 - ravine Baptiste- chemin Summer no3 (Guillaume)

suppression du radier 25 - ravine Baptiste- chemin Summer no3 (Guillaume)

Lot 4 - Removal of Raft 47 - Jardin Ravine - Chemin Zéphir (Le Hangar district in Bois-De Nèfles) and Removal of Raft 21 - Jardin Ravine - Bassin Road (Hangar Ravine in Bois-De Nèfles district)

Removal of slab 47- Jardin ravine - Chemin Zéphir (le Hangar district in Bois-De Nèfles) and Removal of slab 21- Jardin ravine - Chemin Bassin (le Hangar district in Bois-De Nèfles)

Download full details as .pdf
The Buyer:
mairie de Saint-Paul
CPV Code(s):
45246000 - River regulation and flood control works