Lot 1 Locksmith work building:
- 1 St. Kelleraußentreppe 18 Stg.
- 1 steel staircase 8 stg. in the ventilation room
- 108 pcs gratings façade
- 58 posts on escape balcony with duplex coating
- 160 running metres handrail and penetration protection on escape balcony
- 620 m2 stainless steel net as fall protection on escape balcony
- Stair harp, railings, handrails, etc. for escape staircase 3 storeys
Lot 2 Ramp:
- Ramp as bridge construction with grating, railings, handrails, etc., total length approx. 72m, floor area approx. 140 m2,
- Railing and handrail on concrete ramp
Locksmith work buildingLot 1 Locksmith work building:
- 1 St. Kelleraußentreppe 18 Stg.
- 1 steel staircase 8 stg. in the ventilation room
- 108 pcs gratings façade
- 58 posts on escape balcony with duplex coating
- 160 running metres handrail and penetration protection on escape balcony
- 620 m2 stainless steel net as fall protection on escape balcony
- Stair harp, railings, handrails, etc. for escape staircase 3 storeys
Locksmith work rampLot 2 Ramp:
- Ramp as bridge construction with grating, railings, handrails, etc., total length approx. 72m, floor area approx. 140 m2,
- Railing and handrail on concrete ramp