Contract Value:
-
Notice Type:
Contract Notice
Published Date:
04 September 2020
Closing Date:
30 September 2020
Location(s):
DEE09 Harz (DE Germany/DEUTSCHLAND)
Description:
Renewal of the lime plant in the Wienrode waterworks

Renewal of a 2-line lime slaking system (2 x 300 kg / h) for the production of milk of lime from quicklime from the silo flange to dosing in the process water flow including storage, auxiliary systems and EMSR. Automation and process control technology in the Wienrode drinking water treatment plant during ongoing operations. Concrete renovation and production of a coating system with WHG approval. Expansion of a switchgear room. Migration of a control system from SIMATIC S5 to the S 1 500 series.

MTA / EMSR

Lot MTA / EMSR:

Step-by-step dismantling, delivery and assembly of 2 lines of a lime slaking system including dry material conveyance from the silo flange, lime milk storage and dosing in 2 construction phases during ongoing operations; Manufacture, delivery and assembly of 3 tanks per street including fixtures (2 steel storage tanks, 0.5 m 3 ; 2 stainless steel extinguishing containers insulated 1m 3 including vapor scrubber; 2 stainless steel storage containers 12 m 3 ) and pipelines (approx. 60 m steel Rilsan up to DN125, approx. 190 m VA up to DN150, approx. 200 m plastic (PE-HD, hose) up to DN150) and units (10 eccentric screw pumps, 8 of which are metering pumps 1, 8 m 3 / h and 2 ring main pumps 22 m 3 / h, 2 centrifugal pumps 75 m 3 / h, 1 pc. pressure booster 3 x 50 m 3 / h, 4 items of container agitators, 8 items of heated spiral conveyors) and fittings; Steel platforms (StVz) with closed GRP gratings; Compressed air distribution via valve islands, connection of the temporary facility provided and operated by the client for the production of milk of lime during the construction period as a fallback system

EI&C, automation and process control technology of the lime plant including connection and migration of existing systems from the existing I&C room to the new I&C room. Migration of a control system from SIMATIC S5 to the S 1 500 series.

construction

Renovation of approx. 1,000 m 2 Hall floor including polyurea coating as WHG coating; Erection of an EMSR room within a building to accommodate a switchgear (incl. Double floor, ceiling, 1 pc wall)

Download full details as .pdf
The Buyer:
Fernwasserversorgung Elbaue-Ostharz GmbH
CPV Code(s):
41110000 - Drinking water
44619000 - Other containers
45252126 - Drinking-water treatment plant construction work