Renewal of a 2-line lime slaking system (2 x 300 kg / h) for the production of milk of lime from quicklime from the silo flange to dosing in the process water flow including storage, auxiliary systems and EMSR. Automation and process control technology in the Wienrode drinking water treatment plant during ongoing operations. Concrete renovation and production of a coating system with WHG approval. Expansion of a switchgear room. Migration of a control system from SIMATIC S5 to the S 1 500 series.
MTA / EMSRLot MTA / EMSR:
Step-by-step dismantling, delivery and assembly of 2 lines of a lime slaking system including dry material conveyance from the silo flange, lime milk storage and dosing in 2 construction phases during ongoing operations; Manufacture, delivery and assembly of 3 tanks per street including fixtures (2 steel storage tanks, 0.5 m
EI&C, automation and process control technology of the lime plant including connection and migration of existing systems from the existing I&C room to the new I&C room. Migration of a control system from SIMATIC S5 to the S 1 500 series.
constructionRenovation of approx. 1,000 m