The subject of the contract is the preparation of design documentation and works aimed at the implementation of the investment consisting in the delivery, assembly and commissioning of photovoltaic installations and biomass boilers.
Part 1 – photovoltaic installationsThe object of the order is the execution of design documentation and work aimed at the implementation of investments consisting in the delivery, assembly and commissioning of:
Part 1 – photovoltaic installations:
1) photovoltaic panels on the private properties of residents of the municipality - number of installations:
• 35 pcs. with a power of 3.24 kWp,
• 63 pcs. with a power of 4.32 kWp,
• 40 pcs. with a power of 5.40 kWp,
• 44 pcs. with a power of 6.48 kWp.
2) photovoltaic panels on municipal buildings – number of installations:
• 1 pc with a power of 4.68 kWp,
• 1 pc with a power of 5.76 kWp,
• 1 pc with a power of 14,40 kWp,
• 1 pc with a power of 15.12 kWp,
• 1 pc with a power of 18,00 kWp,
• 1 pc with a power of 20.88 kWp,
• 1 pc with a power of 22.32 kWp,
• 1 pc with a power of 39.96 kWp
Part 2 – Biomass boilersThe object of the order is the execution of design documentation and work aimed at the implementation of investments consisting in the delivery, assembly and commissioning of:
Part 2 – Biomass boilers:
1) biomass boilers – number of installations:
• 3 pcs. with a power of 15 kW,
• 2 pcs. with a power of 20 kW,
• 5 pcs. with a power of 25 kW,
• 1 pc with a power of 30 kW,
• 1 pc with a power of 34 kW.