Delivery of climate-neutral natural gas for collection points of the county of Grafschaft Bentheim from 01.01.2023
Acceptance points without performance measurementLot 1: Acceptance points without power measurement
The total energy requirement is 6,044,932 kWh/a and is distributed over 28 collection points.
Acceptance points with performance measurementLot 2: Acceptance points with power measurement
The total energy requirement is 2,496,014 kWh/a and refers to 1 acceptance point.