The subject of the contract is the modernization of the Ustup I pumping station. The scope of works includes:
3.2.1. Delivery and assembly of a complete control cabinet (according to the guidelines and design Replacement of the sewage pumping station switchgear "USTUP I").
3.2.2. Delivery and installation of two electromagnetic flowmeters DN 200 range 0-400m3/h.
3.2.3. Replacement of discharge pipelines with preparation of space for installation of DN 200 seamless flowmeters DN 200 seamless 219.1 x 6.3 and replacement of fittings
3.2.4. Delivery with replacement of cutter shredder
3.2.5. Delivery with replacement of a single-stage pump
3.2.6. Execution of flow continuity works.
The subject of the contract is the modernization of the Ustup I pumping station.
The scope of work includes:
3.2.1. Delivery and assembly of a complete control cabinet (according to the guidelines and design Replacement of the sewage pumping station switchgear "USTUP I").
3.2.2. Delivery and installation of two electromagnetic flowmeters DN 200 range 0-400m3/h.
3.2.3. Replacement of discharge pipelines with preparation of space for installation of DN 200 seamless flowmeters DN 200 seamless 219.1 x 6.3 and replacement of fittings
3.2.4. Delivery with replacement of cutter shredder
3.2.5. Delivery with replacement of a single-stage pump
3.2.6. Execution of flow continuity works.
The detailed scope and description of the subject of the contract includes:
Project - Replacement of sewage pumping station switchgear "USTUP I" and OPZ - Annex No. I to SWZ,
The documentation listed in point 3.3 of the SWZ, hereinafter referred to as "design documentation" or "technical documentation" is an integral part of the SWZ and the model contract.