The project consists of new construction of approximately 9 300 m
— the new construction will primarily contain teaching spaces for Electrical Trades (EL), Technical and Industrial Production (TP) and the trade school. The new construction must as a minimum fulfil the requirement for passive building CF NS 3701,
— reconstruction of wing C, primarily for health and childhood development (HO), assuming that floors 1, 2 and 3 are affected. The reconstruction must provide good area utilisation in wings A and C,
— reconstruction of wing D, including a glass courtyard, will also hold areas for the library,
— premises for PTT/OT service and student services will be located in the new construction or in reconstructed areas,
— alternatively, administration, currently located in Wing A, will be moved to a central part of the building, and PPT/OT and student services could be moved to the location of the current administration,
— assess the need for expanded environmental mapping,
— assess the need for ground surveys,
— demolition of blocks 1, 2, 3, 5 and Wing B. The demolition works are part of the turnkey contract,
— access road to the school premises.