Drywall work delayed in 3 individual construction sections in component C EC up to 2nd floor, demolition and new construction.
Type and scope of the service:
- Drywall work delayed in 3 individual construction sections in component C EC up to 2nd floor, demolition and new construction Overall performance Protection and demolition measures 1 770 m
- Protective cover of floors with cardboard and hardboard 660 m
- Dustproof protection with film for fixed installations, furnishings 1 770 m
- Demolition and disposal of gypsum board slabs including substructure and old polluted mineral wool 1 770 m
- Demolition and disposal of the plaster base with reed pipe and sawn timber and wooden substructure 9 400 kg Disposal of old contaminated mineral wool ceilings below 1 000 m
- Acoustic grid ceiling made of mineral tiles 625 x 625 mm, visible substructure as ceiling area in smooth plasterboard ceiling 470 m
- Plasterboard ceiling as edge and middle frieze in different widths flush with the grid ceiling 250 m
- Gypsum plaster ceilings partly with impregnated panels in secondary and sanitary rooms 50 m
- Hygiene cover made of glass wool panels, visible insertion system 25 m
- Fire protection clothing on cable / line systems I 30 shaft walls, attachment shells, installation clothing 35 m
- Shaft wall F 90 11 ea. Additional facing for pre-wall installations in small areas up to 5 m
- 118 pieces of installation cladding on heating pipes vertically and horizontally in small areas up to 5 m
- Acoustic wall absorber 14 pcs. Acoustic wall absorber B / H 5 000/2 500 mm or 2 500/2 500 mm of 2 or one module, each consisting of aluminum frame and felt-laminated melamine resin foam.