Construction of the water pipeline from Werbach to Gamburg. FA05-BA02.
Construction of water pipes DN 150 and DN 200 (underground) incl. Shaft structures and parallel cable conduits with tension shafts
Pipelines from Werbach to Gamburg as well as from AZS Niklashausen to the former Niklashausen pumping station.Raw and pure water pipes DN 150 from AGS Gamburg/Welzbachtal in Werbach to wells 3 and 4 in Gamburg as well as connecting pipeline from AZS Niklashausen to the former Niklashausen pumping station.
- Parallel water pipes (underground)
Rohwasserleitung DN 150 GGG ZMU, L = ca. 6750 m
Reinwasserleitung DN 150 GGG ZMU, l = ca. 5750 m
Verbindungsleitung AZS Niklashausen - PW Niklashausen DN 150 GGG/ZMU, l= ca. 350 m
- Leerrohrsystem (erdverlegt)
YES 50 PE-HD 3er-Pack, l = ca. 5400 m
DA 50 PE-HD 2er Pack, l = ca. 1350 m
YES 50 PE-HD l Einzelverlegung = 1200 m
3 Kabelzugschächte
- Roads and water crossings (closed construction)
Rohrpressung DN 600 Stahl S355J2H, l = ca. 16 m,
Flush bore for cast iron water pipe DN 150
Total length approx. 390 m for 4 water crossings and
a flush hole in the cycle path
- Shaft structures incl. technical equipment
Pipelines from the AZS Niklashausen to the Gamburg discharge shaftPure water pipe DN 150 from AZS Niklashausen to the
Gamburg discharge shaft as well as a DN 200 discharge pipeline from the Gamburg discharge shaft to the Niklashausen high zone.
New construction of a company building for the pressure reducing station Gamburg.
- Pipelines (underground)
Ablaufleitung DN 200 GGG/ZMU l= ca. 400 m,
Reinwasserleitung DN 150 GGG/ZMU l= ca. 2550 m,
- Dispensing / flushing shaft (4.60 x 3.10 m) incl. technical equipment,
- Ventilation shaft (2.00 x 2.50 m) incl. technical equipment,
- New company building pressure reducing station (4.70 x 3.10 m).