Sewage, water and gas plants
"Renovation of sanitary facilities within an existing building of a school.
Existing installations remain largely intact.
The new drinking water supply to be built is carried out by means of stainless steel drinking water pipes in press connection.
Construction of an extinguishing water network (dry pipes). Waste water pipes as plastic pipes, partly
as cast iron pipes.
- approx. 10 objects, consisting of washbasins, toilet facilities, shower panels
- approx. .200 running meters drinking water pipeline DN 80 to DN 12
- approx. .80lfdm waste water pipe DN 100 to DN 50"