Contracting Authority = @voCampus.
As of 1 August 2021, the merger of 2 educational institutions; Stichting Scholengroep Rijk van Nijmegen and Stichting Alliantie
Project concerns:
1) renovation of the main building and sports building with size of approximately 10,000 m2 of BVO
2) the expansion of the school with new construction with a size of about 750 m2 BVO
The main building is being refurbished in a phase and therefore needs to be partly in operation (2 phases of approx. 50%)
The procedure is outlined in TenderNed. For the exact description and details we refer to the Selection Instructions.
For example, 2x a round of Question NVIs has been recorded and the requirements are clustered. The Selection Guidance is therefore leading.
Construction of the main building and sports building with a size of approximately 10,000 m2 of BVO
The adjustments concern:
internal demolition of a number of walls and installation of new walls
-replacement of suspended ceilings and work on lighting
-customization of wall and floor finishes and doors (incl colours)
-aesthetic adaptations to the entrances of both buildings
- supply and install heat pump for heat and cold for improving climate
-replacement of CHP units and extension of LBKs for improving ventilation
-replace all radiators and convectors
-Expansion of Data Installations