19O20241 House on the Karswald - renovation and extension of the house B5
LOs 10.1 plastering and facade works -WDVS new construction.
- WDVS new building: approx. 1 300 m 2 Attachment of an ETICS system made of mineral insulation. Including preparation of substrate, dowelling, reinforcement, coating in the system (insulation calcium silicate hydrate) incl. about 160 m 2 Attaching skirting boards in the aforementioned system; approx. 632 m soffits insulated + coated in the system; about 925 m 2 Mineral surface plaster in the system (felt plaster structure); about 430 m 2 Mineral thin-layer top coat (vertical grooved plaster); about 49 m 2 Plaster carrier plates for recessed sunshades; approx. 79 m working on façade flush downpipe areas; about 22 m 2 Ceiling insulation in the ETIC system Loggiabereiche; about 30 m 2 Plasterboard in wall and ceiling areas loggia;
- species protection elements in ETICS: approx. 4 pcs of swiveling boxes; approx. 5 pcs of swivel boxes, 2-fold; about 8 pcs of niche breeder boxes; about 4 pieces of bat quarters.