Fjernvarme Fyn Produktion A/S is located in Odense, Denmark and has initiated a procurement procedure concerns the award of a contract for a new steam turbine unit.
The award of the contract requires Tenderers, who can be responsible for a complete project execution (including deliveries of components) for the new steam turbine unit, including the following main supplies
-Engineering, design and QA
-Delivery of a back pressure steam turbine designed for district heating
-Gear if needed
-Generator 10 kV
-District heating turbine condenser
-Auxiliary systems for the above
-Control system
-Electrical installations
-Erection of the above
-Commissioning of the unit, including test runs
-Supply of new spare parts.
Further details for the scope of supply can be seen in section 3 of the Special Conditions.
The Supply shall be a complete and well-functioning steam turbine unit with generator within the battery limits given in the Special Conditions including auxiliary systems and all other equipment and systems that may be needed to fulfil the stated guarantees.
The Supply shall also comply with the functional and technical requirements specified in the Special Conditions, Annexes and Technical Specifications (TS).
The Supply shall be designed, engineered, manufactured, delivered, installed, cleaned, tested, commissioned, and documented according to good engineering practice for power plant prevailing in Europe. It shall be well proven design, safe, economical, and offers a high availability with low forced outage rates.
Please see the Invitation to Tender, the Draft Contract and the General Conditions for more information regarding the commercial terms and conditions.