The object of the contract is the supply and installation of additional lead shielding in metal cells 251/351 and the cessation of shielding "opening" 3.
This contract will be initiated as part of the 5/22 project, which provides for the construction of Building 170X to allow remotely controlled decontamination of high-activity liquid tanks. Connected above these tanks will be constructed metal cells (cells 251/351) from which remotely controlled operations can be carried out in the tanks. The remaining sludge or liquids in the tanks will be transferred to a filtration facility before being transferred to another BP facility for treatment. The path of the transfer lines of this sludge or liquid will pass through the metal cells 251/351. Since these pipes can contain a high-activity liquid, they will need to be shielded to limit the dose rate in the cells.
The object of the contract is the supply and installation of additional lead shielding in metal cells 251/351 and the cessation of shielding "opening" 3.
This contract will be initiated as part of the 5/22 project, which provides for the construction of Building 170X to allow remotely controlled decontamination of high-activity liquid tanks. Connected above these tanks will be constructed metal cells (cells 251/351) from which remotely controlled operations can be carried out in the tanks. The remaining sludge or liquids in the tanks will be transferred to a filtration facility before being transferred to another BP facility for treatment. The path of the transfer lines of this sludge or liquid will pass through the metal cells 251/351. Since these pipes can contain a high-activity liquid, they will need to be shielded to limit the dose rate in the cells.