This document describes the technical requirements applicable to the selective collection, treatment and recovery of waste generated during the deployment of Linky Gérédis meters. The waste resulting from this deployment mainly concerns:
- old meters removed;
- defective circuit breakers;
- the relays removed;
- electrical waste (cables, fuses, etc.);
- wood-type waste (pallet wood, counting panel wood, etc.);
- plastic type waste (door of boxes, boxes, etc.);
- other packaging type waste (plastic, cardboard boxes and packaging, etc.).
Selective collection and recovery services for Waste electrical and electronic equipment (D3E)Selective collection and recovery services for Waste electrical and electronic equipment (D3E) generated / deposited during the installation of a Linky meter.
Selective collection and recovery services for waste from the conditioning of Linky metersSelective collection and recovery services for waste from the packaging of Linky Gérédis meters and to a lesser extent for waste generated by the removal of existing meters.