This tender specifically focuses on the following elements of the NHI Investment Plan:
Section 1: Schematizing the unsaturated zone system and creating the dynamic model input of land use using the relevant basic registrations;
Section 2: Reading weather data and generating the parameters that determine evaporation, including calculating the crop growth model code WOFOST;
Section 3: Use SEAWAT results as a prerequisite for salt transport calculations in the BWPA system (TRANSOL) to facilitate salt damage calculations (= the soil physical relative based on the Base Registration Subsurface);
Section 4: Schematization of soil characteristics and assignment of soil data; i.e. an assignment of soil physical information to the standard soil map but also to a more detailed soil map based on documented tooling scripts.
The expected effective date is April 2022 and the estimated delivery date is fourth quarter 2022 at the latest.