Extension of the Gymnasium Höchstadt a. d. Aisch
4-storey extension with 20 classrooms, specialist rooms for physics as well as learning landscapes, ancillary and technical rooms.
Hybrid construction in reinforced concrete and timber
Extension of Gymnasium Höchstadt a. d. Aisch - Ventilation work
-6 ventilation units with heat recovery 3000 – 8100 m³/h
-Approx. 3650 m² ventilation ducts straight and fitting
-Approx. 330 m ventilation pipe with fittings DN 80 – DN 224 mm
-100 pieces fire dampers with spring return actuator
-68 pieces volume flow controller square with silencer
-58 pieces volume flow controller in round design
-2 pieces of outdoor air intake towers stainless steel nominal diameter 1500 mm
-188 pieces of air outlets