In the special school, the main building is to be partially renovated and the exercise pool is to be repaired, including the swimming pool and other technology.
Furthermore, fire protection measures and pollutant remediation are to be carried out on the basement and ground floor.
In addition, the special school is to receive an extension and extension of the exercise pool with group, function and ancillary rooms with barrier-free access in a size of approx. 1,000 m².
For this purpose, the installation of a stainless steel swimming pool must be carried out.
1 hour Swimming pool stainless steel, freestanding, 12 x 5 m,
Water depth 0.75 – 1.25 m
1 St. Gewöhnungstreppe
1 St. Gewöhnungsrutsche
Reinwasserverteilung Bodenkanäle