Electrical installation work | Tenderlake

Electrical installation work

Contract Value:
EUR 383K - 383K
Notice Type:
Contract Notice
Published Date:
24 December 2019
Closing Date:
28 January 2020
Location(s):
DE139 Lörrach (DE Germany/DEUTSCHLAND)
Description:
Education and support campus, renovation of old buildings, electronics

Distributions - 1 sub-distributor, approx. 100A,

- 2 sub-distributors, approx. 63A.

Electrical installation approx. 9 000 m cables, approx. 150 m cable tray approx. 40 m plastic duct, approx. 185 m surface conduits lighting approx. 200 LED recessed lights

Safety lighting 1 battery system 23A / hour and approx. 35 emergency lights KNX control daylight light control, shading control, central controls BMA 1 fire alarm center with connection to control center approx. 225 fire and manual detectors, approx. 26 sirens network 1 19 "network stand distributor, approx. 170 Network connections PA system approx. 50 loudspeakers.

Distributions - 1 sub-distributor, approx. 100A,

- 2 sub-distributors, approx. 63A.

Electrical installation approx. 9 000 m cables, approx. 150 m cable tray approx. 40 m plastic duct, approx. 185 m surface conduits lighting approx. 200 LED recessed lights

Safety lighting 1 battery system 23A / hour and approx. 35 emergency lights KNX control daylight light control, shading control, central controls BMA 1 fire alarm center with connection to control center approx. 225 fire and manual detectors, approx. 26 sirens network 1 19 "network stand distributor, approx. 170 Network connections PA system approx. 50 loudspeakers.

Download full details as .pdf
The Buyer:
Gemeinde Maulburg
CPV Code(s):
45310000 - Electrical installation work