The district of Fürth intends to award the replacement of the external shading in 5 construction phases at the administrative building of the district office Fürth, Zirndorf office.
The performance of the 1st construction phase of the administration building Landratsamt Fürth includes the replacement of the existing sun protection awnings on the east side - component 3 for new venetian blinds with the following scope:
- Dismantling of the existing fabric awnings incl. the previous transparent bezels and guide ropes. The demolition material must be separated and sorted according to materials and disposed of professionally.
- Installation of the new venetian blind system