The contract includes optional instalments defined in the specifications. Each lot will be allocated separately. The services are paid for by all-inclusive prices. Functional restructuring - energy renovation of the Cité Mixte Charles de Gaulle in Apt composed of several buildings (gymnasium, middle school, high school, boarding school, half board). Project plot area 54,000 m2 - gross floor area approx. 26,845 m2 This is the relaunch of Lot 01, broken down into two lots: Lot 1a and Lot 1b, resulting from a procedure launched in 7 lots
Big work- Asbestos removal of the premises according to asbestos ratio (Faience glue: about 90 square meters - fiber cement duct: 101 u approximately).- Complete heavy demolition of building 9 - segpa including interior cleaning of the building (Floor area: 215 square meters approximately).- Structural work: Interior cleaning of the premises (False ceiling: 12,392 square meters approximately- sanitary plumbing and HVAC: 12,732 square meters approximately- flexible floor coverings: 1852 square meters approximately)- demolition- underpinning opening (Ground floor: 40 u approximately)- earthworks - foundations (concrete awning sills: 142 m3 approximately)- miscellaneous structural works- hard floor coverings (tiles: 8,650 square meters approximately) and wall coverings (earthenware: 2,715 square meters approximately)- elevator (1 elevator 630 Kg for Building6a - gymnasium)
Metal Frame / Facades- facades (Ite: approx. 2,950 square metres- painting: approx. 6,064 sq m- fibre cement cladding: approx. 3,020 sq m)- metal structure / Roofing / Waterproofing / Sun protection (Metal structure awning: approx. 50,000 kg - metal roof: approx. 1,285 square metres- expanded metal ceiling: approx. 1,695 square metres- sun protection with horizontal fixed slats: approx. 318 u)