Wastewater treatment plant construction work | Tenderlake

Wastewater treatment plant construction work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
27 October 2023
Closing Date:
24 November 2023
Location(s):
DE944 Osnabrück, Kreisfreie Stadt (DE Germany/DEUTSCHLAND)
Description:
KW Eversburg: Prozesswasserbehandlung MTA

Design, detailed planning, delivery, construction and commissioning of a 2-road, 1-stage deammonification incl.

storage structures, as well as adaptation and connection to

required existing facilities.

"Machine technology process water treatment" essentially includes the design, delivery, installation and commissioning

of the components listed below in the field of process water treatment, taking into account step-by-step enclosing processes.

Pipeline construction

- New construction of interconnectors

- New construction of air ducts, partly in insulated design

- Creation of flush connections

- Installation of fittings

Pumpentechnik

- Installation of new PCB intermediate pumps, measurement technology

- Installation of all measurement technology installed in pipelines and containers.

Dosing technology

- Installation of the necessary dosing technology, e.g. defoamer, nutrient solution

- Adaptation of the existing lime milk plant as required

Prozesswasserbehandlung

- Installation of the process-specific scope

- Installation Granulatlagertank

Others

- Functional description of the system for programming by the client

Download full details as .pdf
The Buyer:
SWO Netz GmbH
CPV Code(s):
45252127 - Wastewater treatment plant construction work