Trade, plumbing, company building
for the Leonberg fermentation plant
- Technical building equipment -
Component delivery hall:
- Drinking water installation in the factory hall consisting of hose boxes
wall-mounted with frost protection
- Heating cable installation in the factory hall up to the supply and return of the
HVAC system of the sorting box
Component of the control room extension delivery hall:
- Drinking water installation in the control room annex
- sanitary installations consisting of 2 pcs toilets; 3 pcs washbasins; 1 pc
Urinal incl. hygienic flush
- Sewage pipes incl. string ventilation
- Heating supply consisting of transfer station, heating piping
and radiators
- Air conditioning consisting of 2 indoor units in the control room, 1 pc.
Indoor unit in the control room and an outdoor unit
Component fermentation residue conditioning:
- Drinking water installation consisting of 2 pcs. sink, 2 pcs.
Emergency showers and hose box for wall mounting
- Sewage pipes
- Heating piping from the on-site transfer station with pipeline and
Lufterhitzer
- Air conditioning control room consisting of 1 piece indoor unit and 1 piece
Außengerät
Component workshop:
- Drinking water installation consisting of washbasin and hose box
for wall mounting
- Sewage pipes
- Heating piping consisting of transfer station, heating piping
and radiators or air heaters
Wärmeverteilnetz:
- Underground pipelines in double pipe design
- Introduction to the buildings up to the heat transfer stations and the
Connection point at the combined heat and power plant
- Civil engineering for pipe trenches and pipe trench backfilling is carried out on site