Landscaping work.
- Lift off the sub-floor / gravel base layer and dispose of it - 950.00 m
- Delivery and installation of topsoil and substrate - 250.00 m
- Delivery and installation of the gravel base layer - 1,050.00 m
- Concrete slabs and concrete pavement - 1,300.00 m
- Asphalt base course - 700.00 m
- Bar fence and gates - 125.00 m;
- drainage and facade channels - 220.00 m;
- Bicycle stand brackets - 14.00 each;
- benches - 4.00 pieces;
- rubbish bin - 2.00 pieces;
- tool shed - 1.00 items;
- trees - 9.00 pieces;
- bushes - 10.00 pc;
- ground cover, small shrubs - 3 800.00 pieces;
- Seed sowing - 1,500.00 m
- All-weather synthetic surface.