Architectural, engineering and planning services | Tenderlake

Architectural, engineering and planning services

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
16 January 2019
Closing Date:
14 February 2019
Location(s):
DEB32 Kaiserslautern, Kreisfreie Stadt (DE Germany/DEUTSCHLAND)
Description:

The aim of the award procedure is the awarding of engineering services for the technical equipment, equipment groups 1-3 and 6-8, LPH 7 (partial) and LPH 8 + 9 according to HOAI § 55, for the construction of a new workshop and laboratory building of HS Kaiserslautern.

Chargeable costs (net) acc. Cost calculation for the 2nd HU construction:

1.1.1) sewage, water and gas installations 1 043 487.00 EUR;

1.1.2) heat supply systems 2 037 174,00 EUR;

1.1.3) Ventilation systems 4 436 366.00 EUR;

1.1.6) Conveyors 673 820.00 EUR;

1.1.7 (1) Fire extinguishing systems 142 EUR 395.00;

1.1.7 (2) media supply facilities 225 742,00 EUR;

1.1.7 (3) Laboratory equipment 764 076,00 EUR;

1.1.7 (4) process heat, cooling, air systems 280 174,00 EUR;

1.1.7 (5) Disposal facilities 22 516,00 EUR;

1.1.7 (9) climatic chamber 78 000,00 EUR;

1.1.8 Building automation 1 409 200.00 EUR.

Total: 11 112 950,00 EUR,

HOAI § 53, HOAI § 55, LPH 7 (partial) and LPH 8 + 9 for the new construction of a workshop and laboratory building of the University of Kaiserslautern.

ALG 1:

- roof drainage as a high pressure system, separation system, rainwater downpipes and

- collecting lines,

- waste water pipes, laboratory sewage system, lifting equipment,

- Drinking water system for sanitary objects, tea kitchens, eye showers, emergency showers, stagnation free with system flushing device,

- decentralized domestic hot water production,

- Operating water system for laboratory areas, pressure booster system,

- gas installation for laboratory supply,

- sanitary facilities, sanitary facilities barrier-free, emergency showers,

- insulation work on technical equipment,

- Control tasks, measured value acquisition and processing by means of DDC (GA).

ALG 2:

- 2 pieces heat generator 400 kW as water / water heat pump, dual (325 kW cooling capacity), storage tank 4 000 l,

- heat distribution network with heating circuit distributors for BTA, DSP, radiators,

- BTA and DSP as changeover system for heating / cooling operation,

- BTA system in ceilings of the EC, 1st floor and 2nd floor, control of freely programmable DDC,

- DSP in multi-storey rooms and the mall, room temperature controlled, programmable DDC,

- radiator with thermostatic valves,

- heat metering devices, pressure maintenance systems, safety devices,

- Connection groups of air heaters in HVAC systems,

- insulation work on technical equipment,

- Control tasks, measured value acquisition and processing by means of DDC (GA).

ALG 3:

- RLT central units as air conditioning and partial air conditioning systems, exhausts for special exhaust air. Safety Cabinets Ventilators / RLT equipment for technical rooms, RLT equipment for supplying laboratories, test benches, combustion air Engine and chassis dynamometer. Total about 35 plants,

- AU towers, grounded AU line,

- air duct system in the building as a duct or pipe,

- Exhaust air system for special exhaust air, laboratory exhaust air, plastic fume hoods PPS,

- fire dampers, volumetric flow controllers,

- refrigeration systems for HVAC systems, IT and process refrigeration, cooling load 1,400 kW,

- 2 water / water heat pumps, dual (each 325 kW cooling capacity),

- use of water from "Lauterwasserkanal" (third order water), 3 heat exchangers per 250 kW,

- recooling plants, adiabat roof-mounted,

- insulation work on technical equipment,

- Control tasks, measured value acquisition and processing by means of DDC (GA).

ALG 6:

- 2 passenger lifts EN 81-70,

- 6 crane systems, single-girder overhead crane.

ALG 7.1:

- Extinguishing water supply wet system 1988-600, wall hydrants DIN 14461-1, fire water tank 18m 3 , Booster station.

ALG 7.2:

- Compressed air generation 2 piston compressor systems, 8,8m 3 / min, 8bar; Pipeline network, withdrawal units,

- High purity gas supply.

ALG 7.3:

- Laboratory fume cupboards, technical fume cupboards, safety cabinets, laboratory workstations, sinks, medical cells, point extractors.

ALG 7.4:

- Cooling system engine test bench / car test bench 560 kW, cooling fuel conditioning system, circulating air cooling system,

- exhaust extraction system.

ALG 7.5:

- Chip extraction system.

ALG 7.8:

- Climate chamber, refrigeration aggregate, ultrasonic humidifier.

ALG 8:

- Automation level from ISP with DDC substations (BACnet), VBE, integration in MBE, consumption recording M-BUS, field level.

The award of the construction work is carried out as a single contract award.

Download full details as .pdf
The Buyer:
Land Rheinland-Pfalz, vertreten durch das Ministerium der Finanzen, vertreten durch den Landesbetrieb Liegenschafts- und Baubetreuung, Niederlassung Kaiserslautern, vertreten durch die Niederlassungsleitung
CPV Code(s):
71240000 - Architectural, engineering and planning services