- Construction of two concrete pipe tunnels, approx. 1,400 m
- Construction of a retaining wall in concrete construction, approx. 180 m
- bit. Ceiling construction, approx. 9,000 m
- Excavation of approx. 27,000 t of contaminated soil from the former Dhünnaue landfill under the specifications of the emissions protection concept,
- Work on opening and reclosing the landfill seal under the specifications of the emission protection concept,
- Otherwise. Services.
- Construction of two concrete pipe tunnels, approx. 1,400 m
- Construction of a retaining wall in concrete construction, approx. 180 m
- bit. Ceiling construction, approx. 9,000 m
- Excavation of approx. 27,000 t of contaminated soil from the former Dhünnaue landfill under the specifications of the emissions protection concept,
- Work on opening and reclosing the landfill seal under the specifications of the emission protection concept,
- Otherwise. Services.