Lot 01 Rainwater sewerage/electric route
Construction of a new discharge point for the discharge of rainwater into the 3-crown ditch; approx. 70 m rainwater sewer and 2 shafts incl. excavation and backfilling; dewatering works; approx. 40 m2 of slope and sole protection; approx. 12 m hearth walls; approx. 60 m multi-pipe 4-fold with cable conduit as well as cable duct incl. excavation and backfilling