Each lot will be allocated separately. The services are regulated by fixed prices. The project concerns the rehabilitation and energy renovation of the day school building - building 2.This building has 3 (three) levels:- ground floor, occupied by classrooms, administrative offices, and school life premises, on 1490 square meters Sdp about - r + 1, occupied by classrooms and premises school life, on 1780 square meters Sdp about - r + 2 partial for staff housing of about 252 square meters Sdp. This consultation is part of an operation of 10 lots broken down into two phases. The lots concerned by each phase are as follows:P hase 1: lots 1, 2 and 10.Phase 2: lots 3, 4, 5, 6, 7, 8 and 9.La this consultation concerns phase 1
Lead removal - asbestos removalasbestos removal work (including asbestos glue under flooring) and lead removal (including on door block paints, window bars)
Soil consolidationsoil consolidation work by jet grouting (injection of high-pressure cement grout), It is estimated that about 249 injection columns will be built.
ssi / Sssimplementation of an Ssi and Sss system in connection with the day school and the other buildings of the site, as well as the Ip autocom, the new ainti-intrusion system, the relocation of the video protection screen, the clock system