On the coherent surface, the surfaces should be produced in:
- small granite pavement;
- large granite pavement;
- water-bound ceiling;
- lawns;
- Planting areas including the shelves.
In addition, the following are to be established:
- fencing;
- gate systems;
- cisterns for irrigation of the areas;
- pond system;
- infiltration troughs / basins;
- drainage inlets;
- Earth modeling;
- topsoil coverage;
- Amphitheater (earth modeling only);
- planting, greening.
The scope of the construction work includes:
- 1 psch. Clearing construction site;
- 32 m
- 580 m
- 1,860 m
- 1 101 m
- pick up 200 m of curbs;
- 1 180 m
- 3,350 m
- create 235 m of cable trench;
- 1,697 m
- 5,995 m
- 70 m drainage pipes;
- 6 street inlets;
- 2 infiltration troughs;
- Install 3 cisterns;
- 1 pond system;
- 258 m
- 90 m
- put 530 m of large granite paving line;
- 36 m
- 490 m
- 799 m
- 450 m
- 80 m fence fence;
- 4 gates;
- 20 tree plantings;
- 70 shrub plantings;
- 50 pcs bike racks;
- 4 pieces of wastebasket.