Structural work for a primary school extension and renovation of the existing buildings
Structural work for school extension and renovation of the existing buildings in 3 construction phases: excavated soil 1 500 m³, in-situ concrete 1 500 m 2 , Reinforcing steel 250 t, 20 t mild steel, Extensive renovation works in stock