- construction site equipment
- Earthworks, excavation approx. 500 m³
- Drainage sewer work, pipe trench approx. 400 m + trench packing (420 litres)
- Demolition and dismantling work
- Concrete drilling and cutting work and concrete work
- grounding system
- Mauerarbeiten ca. 600 m³
- Waterproofing work (waterproofing approx. 230 m³ + perimeter insulation approx. 220 m³)
- Steel structures (interception steel structure, exterior walls)