This consultation concerns a contract with an adapted works procedure which aims at the redevelopment of the 6th floor of the headquarters of the CAF de la Moselle.
wiring and electrical installationswiring and electrical installations
Textile floor coveringsTextile floor coverings
painting / wall coveringspainting / wall coverings
Ventilation / Heating / PlumbingVentilation / Heating / Plumbing
Interior woodwork workInterior woodwork work
Installation of movable bulkheads - cabinsInstallation of movable bulkheads - cabins
Plasterwork, partitioning, false ceilingsPlasterwork, partitioning, false ceilings