Lot 50-1 outdoor civil engineering (§ 3 Abs. 9 VgV 80% contingent) - renovation of secondary school Am Merzdorfer Park - renovation of existing buildings, new building extension and. Connector and new building of sports hall and outdoor facilities school and Gym.
- 1 psch construction site equipment;
- 2 150 m
- 460 m
- 360 m
- 430 m piping KGEM-PP pipe DN / OD 110-160 SN 8;
- 230 m piping KGEM-PP pipe DN / OD 200-250 SN 8;
- 185 m piping KGEM-PP pipe DN / OD 315-400 SN 8;
- 17 pieces FT shaft DU 1000 / 1.39-2.77 m;
- 11 rinsing and inspection chutes h = 1.38-2.61 m;
- 1 piece of fat separator system with FA, sampling + lifting system;
- 51 m
- 300 m
- 300 m
- 210 m
- Demolish 280 m of curbs, dispose of them;
- 60 m
- 50 m
- 100 m
- 1 000 m
- 1 200 m
- 100 m drainage DN 100, full seepage.