The contract mainly comprises:
Construction bike paths and sewerage N747:
• Preparatory work and greenery
- Harvesting of trees
- Harvesting of thickets
- Breakdown of existing hardening
- Construction of the roadside due to utilities
• Realizing a separate sewer system:
- Construction of RWA sewerage (porous, reinforced and unarmed pipes)
- Construction and reconstruction canal system.
- Construction of DWA sewerage (grès) with pressure sewage
- Connection of new sewerage to existing collector
- Connection of existing swirl to sewerage.
• The building of bike paths:
- Explanation works and construction taluds
- Asphalt bike path in the roadside and/or next to the roadway
- Watercourses crosses by construction constructions.
- Construction of motorway crossroads — N747
• Delivering and placing final signage
• Greenworks:
- Lawn roadbuilding
- Construction of roadworm
- Tree planting
• Maintenance of works during the guarantee period
• Archaeological Research (Fixed Part)
• Archaeological preliminary research (conditional part)
Construction of bike paths and sewerage along N747