The State Agency for Flood Protection and Water Management Saxony-Anhalt (LHW) intends to take this measure
the construction of a new dike with an entertainment path on the Ilseufer over a total length of 535 m.
Furthermore, a passage DN300 with a slide shaft is to be built.
Plantings shall be carried out as recultivation and compensatory measures.
New construction of the Ilse/ Ellerbach dike over a length of 535 m
- Delivery and installation of steel sheet pile wall approx. 1,390 m²,
- Remove topsoil approx. 3190 m³,
- Cover topsoil approx. 1,610 m³m
- Dissolve soil approx. 590 m³,
- Soil improvement approx. 2,700 m²,
- Delivery and installation of support body material approx. 5,460 m³,
- production of drainage ditch over a length of approx. 240 m,
- production of maintenance road with asphalt base course AC16 TD LW approx. 235 m,
- Production of entertainment trail with water Surface course approx. 320 m,
- construction of entertainment trail with gravel grass about 275 m,
- production of passage DN 300 StB approx. 12 m,
- production of slide shaft DU 1200 mm with cover plate and control slide for closure opening DN 300,
Landschaftsbauarbeiten
- Surface greening lawn with RSM Regio. approx. 4,650 m² dike area,
- Surface greening lawn with RSM Regio. approx. 1100 m² protective strip,
- Planting of shrubs and light heisters approx. 1,100 pieces,
- Completion and development maintenance of the plantations.