New construction LKA asservation camp and KMBD interim storage Biesenthal, heating technology
Heating technology.
The property is supplied with heat and passive cooling via an existing double-pipe system via two brine / water heat pumps. In 10 buildings approx. 5,200 m PE pipe and 11 FBH distributors will be installed.